Precautions for the installation of the centrifuge

What should be paid attention to when the centrifuge is installed?

The centrifuge should pay attention to the following points during installation:

1. Power supply voltage : The voltage fluctuation should meet the national standard within +10% . Otherwise, some manufacturers' centrifuges cannot operate normally. If the voltage fluctuations in the above, it is recommended by the regulator, for compliance with this grid.

2. The ground wire should be firmly : the wiring of the power supply of the room should meet the requirements. China is a three-phase four-wire system. The three-phase is the three-phase in industrial power . When three-phase electricity is used, the neutral line is separated from the ground line . More importantly, whether it is three-phase industrial power or not , the general single-phase power is good , and the ground line should be reliable to avoid leakage. The ground wire cannot be connected to the heating pipe or the water pipe.

3. The ground should be smooth and firm: large centrifuges, the installation site ground to firm, smooth, and ensure that the centrifuge rotor to work, do not go pouch.

4. The distance between the centrifuge and the wall is at least 30CM to facilitate air circulation.

5. Centrifuge large level to find a good: small to find a more accurate spirit level, the centrifuge lid opens, looking at the level of the spindle by screwing the adjustment screw to adjust the caster next came to a good level, wherein a foot note can fall .